Missing Infrastructure

by

Last semester the administration reduced the number of exams from four to three removing the optional and ever popular N-1. They increased the timing from 2.45 to 4.15 and this semester they are facing the only so logical problem of the returning MBA’s, even if they are few in numbers. So now they are out of classrooms.

Am not joking IBA is out of classrooms. It has fallen to the fallacy of inducting too many students and not doing anything to build infrastructure. We still have the same auditorium(seating capacity around 300-400), same number of classrooms (7 in old building and 12 in CCS building), same library (est capacity 70-90), same number of computer labs (3), same printers (4 for students, working condition unknown), same parking space(though they did convert the basketball court into a car park) and the strength this year is nearing 900 students for the city campus.We are inducting faculty but we seriously dont have space for them to sit.

Have heard no plans for building of any infrastructure in the near future.

I wonder how many students will get inducted this year.

Advertisements

Tags: ,

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s


%d bloggers like this: